Jinshan Water Work, with supply capacity of 200,000 tons/da y, is able to supply adequate water source to the companies in the Base. Power resource is sufficient in the Base, with two 35 kV transformer stations available. Power cables have been routed along the main roads. 8 KG natural gas is available for the companies in the Base. The sewage discharge system in the Base is connected to Jinshan main drain for sewage treatment and disposal to sea. The main sewer has been laid along the main roads and every company in the Base has set a discharge port, with collection capacity of 20,000 tons/day.
Abundant Utility Resources Fueling up Investment
[充沛的水电气资源,为投资者加油]
电话机装机容量为10000门国际程控,IP宽带多媒体通讯网通入基地,为基地与外界联系架起了“空中桥梁”。 Installed capacity reaches 10,000 international program-controlled telephone sets, and IP broadband multimedia communication network has accessed the Base, connecting it to the outside world with an "air bridge".